408.436.9830ShopGet a quote
Electrical contractor installing a commercial EV charging station
Solutions · Electrical contractors

EV charging station installers trust CyberSwitching.

Commercial Level 2 and DC fast chargers that are simple to install and easy to pass inspection, backed by a San Jose engineering team that has supported 960+ customers since 1994.

ETL listedENERGY STARCTEP certifiedOCPP
5,000+Commercial chargers deployed
960+Customers across the U.S.
30+States in our installer network, plus Canada
1994Designing power hardware in San Jose
Why installers choose us

Hardware that makes your job easier.

The electric vehicle market is growing fast, and property owners need contractors who can deliver code-compliant charging on schedule. CyberSwitching chargers are designed with the installer in mind.

01

Simple to install

The CSE1 weighs 19 lb and mounts on a wall or a pedestal, so most single and dual installs are straightforward for any licensed electrician.

02

Built to pass inspection

ETL listed to UL 2594, UL 2251 and UL 2231, designed for NEC Article 625, with a Type 3 enclosure for indoor and outdoor sites.

03

More ports, same panel

Cloud-based load management over OCPP shares capacity between chargers on one circuit, often avoiding a service or panel upgrade.

04

Engineering support

Our team helps with charger selection and load calculations, and provides drawings, CAD files and specifications on request.

Electrical quick reference

Size the circuit at a glance.

EV charging is a continuous load: NEC Article 625 requires each branch circuit to be rated at 125% of the charger’s output. See each spec sheet for full ratings and dimensions.

SpecificationModelCSE1ModelCSE4-48ModelCSE4 80A
Charging levelLevel 2, 208/240V ACLevel 2, 208/240V ACLevel 2, 208/240V AC
Max output per port48A · 11.5 kW48A · 11.5 kW80A · 19.2 kW
Branch circuit per port60A60A100A
ConfigurationSingle or dualDualDual
MountingWall or pedestalPedestal with cable managementPedestal
Load managementCloud-based over OCPPCloud-based over OCPPCloud-based over OCPP
Level 2 charging stations →DC fast charging stations →
How we work together

From site walk to first charge.

01

Assessment & selection

Share the site, panel capacity and number of parking spaces. We help you choose chargers and decide whether load management can avoid an electrical upgrade.

02

Permitting & installation

Use our spec sheets, drawings and installation guides for permit sets. Wall or pedestal mounting keeps installs flexible across garages and surface lots.

03

Commissioning & activation

Our team supports network activation, access control and payment setup so the property owner can start charging drivers right away.

Installer network

Join our network of recommended installers.

CyberSwitching has worked with hundreds of electrical contractors across the United States. When property owners ask for an installer, we recommend contractors we have worked with.

  • Referrals for commercial projects in your area
  • Workplace, multifamily, fleet and public sites
  • Direct support from our team on every project
Map of CyberSwitching recommended EV charger installers across the United States
Installer FAQ

Questions installers ask us.

Can the CSE1 be installed outdoors?

Yes. The CSE1 is rated for indoor and outdoor installations and is manufactured with a Type 3 enclosure.

Is the CSE1 certified?

Yes. The CSE1 is ETL listed and designed to UL 2594 (electric vehicle supply equipment), UL 2251 (plugs, receptacles and couplers for EVs), UL 2231-2 (personnel protection systems for EV supply circuits) and UL 1998 (software in programmable components), and for installation under NFPA 70 (NEC) Article 625.

What breaker size does a commercial Level 2 charger need?

EV charging is a continuous load, so NEC Article 625 requires the circuit to be rated at 125% of the charger's output. A 48A charger such as the CSE1 or CSE4-48 needs a 60A breaker per port, and an 80A charger such as the CSE4 80A needs a 100A breaker per port.

Can several chargers share one circuit or panel?

Yes. CyberSwitching dynamic load management is cloud-based over OCPP: you set a power limit for a group of chargers and the software shares that capacity between active sessions. No extra load-management hardware is needed, which often avoids a service or panel upgrade.

What should I consider when installing multiple EV charging stations?

Start with the available electrical capacity at the panel and service, then decide whether load management will let you add more ports without an upgrade. Plan conduit runs and mounting (wall or pedestal), confirm network connectivity at each location, and check local permitting requirements and utility rebates before you finalize the layout.

Do you provide drawings, CAD files and specifications?

Yes. Spec sheets can be downloaded directly, and CAD files, typical drawings, wiring diagrams and installation guides are available on request from our team.

Contact

Working on a project? Talk to our team.

Send us your project details or ask to join our recommended installer network. We’ll help with charger selection, load calculations and pricing.

Tell us about your project